Automation

ENGINEERING

  • Control system architecture (from scratch, migration)
  • I/O List, memory map
  • Control panel wiring diagram and layout
  • Logic Diagram
  • Cause and effect Matrix

PROCUREMENT

  • Material requisition
  • Request for quotation
  • Offers tabulation
  • Technical alignment

CONSTRUCTION

  • PLC Control panel (HW+SW)
  • RTU panel
  • HMI panel (HW+SW)
  • SCADA Station

SERVICE

  • Erection supervision
  • Precommissioning and commissioning
  • Startup
  • Maintenance (SW backup)
  • Spare parts supply
  • HW/SW modification / upgrade

INSTRUMENTATION

  • Foxboro/Eckardt by SCHEIDER ELECTRIC
  • Process Field Devices
  • Pressure, Flow, Level, Temperature
  • Analysis and Valve Positioners

PETROSTAR

Send us a message

  • This field is for validation purposes and should be left unchanged.